Traffic info

To ensure that all participants are well informed, we provide you with information about the most important road closures and detours within the framework of the Oberbank Linz Danube Marathon.

The most important information on the traffic situation

The A7, the Mühlkreisautobahn, will be closed in both directions between the Prinz-Eugen-Straße and Treffling junctions from 04:00 in the morning until around 12:00 noon.

Other on and off-ramps will also be closed:

At Wiener Straße, Neue Welt/ Salzburger Straße.
Arriving runners* can leave after the Bindermichl - RI Prag - Freistadt enclosure as far as the Prinz- Eugen-Straße - Industriezeile exit

The departure to Treffling is always possible - from Treffling: Closure from 04:00 a.m. in southern direction!!!

The running route will be closed from 7:00 am!

Nibelungen Bridge:

The Nibelungen Bridge will be completely closed to traffic. All vehicles wishing to cross the Danube will be diverted via the new A26 Donautalbrücke. (toll-free)

Accessible roads:

There is a continuous connection from the A7 via the Westbrücke - Waldeggstraße - Römerbergtunnel - A26 Donautalbrücke - towards Bad Leonfelden.

The A7 is continuously accessible from the A1 to the Prinz-Eugen-Straße exit (including the Prinz-Eugen-Straße exit to Industriezeile).

The Ebelsberg bypass with connection to the A7 and the Steyreggerbrücke bridge is open to traffic.

Here you can download a map with information about the closed and passable roads:

Marathon Traffic

Linz Marathon Traffic

Rail replacement service

Information on the rail replacement service for the streetcar lines can be found here in good time.

More information

  • The exit from the underground parking garage Brucknertower - Wildbergstraße is not possible on Sunday, April 12, 2026 morning.